- Visión General
- Real shooting
- Customer feedback
- Our partners
- Product workshop
- Package
- Contact me
- PACKING & PAYMENT
- FAQ
Información Básica.
No. de Modelo.
GZY-Q21 ATS
Material de Shell
Planchas de acero
Shell Grado de la protección
IP55
Marca
eaton, delixi, chint...
garantía
12 meses
tamaño de la caja/armario
personalizado
color
personalizado
nombre del producto
armario/panel de control
tipo de producto
un control por uno
operación
protección contra sobrecarga
función
iniciar parada
especificaciones
admitir la personalización
clase de protección
ip54~66
voltaje
220/380/415/440/460/480V
grosor de la caja/armario
0,8/1,2/1,5mm
actual
personalizado
frecuencia de salida
0-60hz
Paquete de Transporte
Standard Export Wooden Box with Pallet
Especificación
customized
Marca Comercial
GZY
Origen
Fujian, China
Código del HS
8537109090
Capacidad de Producción
500 Piece/Pieces Per Month
Descripción de Producto
Name | Control cabinet/panel |
Product type | One control by one |
Box/cabinet size | Customizable |
Funtion | Start Stop |
Box/cabinet thickness | 0.8/1.2/1.5mm |
Instal type | wall mounting/console mode |
Fujian Guozhiyun Information Technology Co., Ltd., is located in Fuzhou City, Fujian Province, our philosophy is to do our best to provide customers with the most cost-effective Chinese products.We are a professional company engaged in electrical automation, committed to providing customers with integrated power distribution and automation solutions for the design, production, and PLC programming of high and low voltage electrical control cabinets, distribution cabinets, explosion-proof cabinets, etc. Our products and services are widely used in various industrial fields, including manufacturing, energy, transportation, petrochemical, etc.If you have any needs or questions, please feel free to contact us at any time. We will wholeheartedly serve you!
Whether it be ABB, Omron, DELIXI,Eaton or other brands of electrical parts, we are used to working with the most reknowned brands and we are able to recommend the ones that best fit your application and your budget.
Order Process Diagram
Applicable Industry: can widely use in metallurgy, chemical industry, petroleum, water supply, mine, building material, electrical motor industry, such as pumps, fans, air compressor, rolling mill, injection molding machine, conveyer belt and other machinery and equipments.
Provide one-to-one industry customized solutions,From scheme design to assembly, we maintain a rigorous attitude at every step.
1.Q: Are you a manufacturer or trader?
A:We are all, Main business of the company low-voltage switchgear, power distribution cabinet, explosion-proof cabinet design, production and system programming.
2.Q: Whether to support OEM/ODM?Can you design the equipment according to our size?
A: Of course, we can customize any product according to customer requirements, and we can provide design solutions and solutions.
3.Q: Why should I buy from you instead of someone else?
A: First of all, we can provide all customers with very professional support consisting of IT consultants and service teams.Secondly, our main engineers have more than 20 years of experience in power distribution equipment development.
4.Q:What about the delivery time?
A:Generally, our delivery time is around 7-15 days about. While, it depends on the requirement of customers and the quantity of products.
5.Q:What about the shipment?
A:We can arrange shipment by DHL, FedEx, UPS,etc.of course, customers can also use their own freight forwarders.
6.Q:How about the terms of payment?
A:Supported T/TPaypalApple PayGoogle PayWestern Union,etc. Of course we can discuss on this.
A:We are all, Main business of the company low-voltage switchgear, power distribution cabinet, explosion-proof cabinet design, production and system programming.
2.Q: Whether to support OEM/ODM?Can you design the equipment according to our size?
A: Of course, we can customize any product according to customer requirements, and we can provide design solutions and solutions.
3.Q: Why should I buy from you instead of someone else?
A: First of all, we can provide all customers with very professional support consisting of IT consultants and service teams.Secondly, our main engineers have more than 20 years of experience in power distribution equipment development.
4.Q:What about the delivery time?
A:Generally, our delivery time is around 7-15 days about. While, it depends on the requirement of customers and the quantity of products.
5.Q:What about the shipment?
A:We can arrange shipment by DHL, FedEx, UPS,etc.of course, customers can also use their own freight forwarders.
6.Q:How about the terms of payment?
A:Supported T/TPaypalApple PayGoogle PayWestern Union,etc. Of course we can discuss on this.